click photo to enlarge |
Tuesday, August 31, 2010
Friday, July 23, 2010
The finishing touches
Kitchen/bathroom counters are in, water heater done, screens, screen door all done, cistern and gutters are connected ladder to crow's nest- done. outdoor shower done. think the only thing left is propane frig and solar power. that will be done by Christmas if not before. but that is luxury items. I stayed in the house for 3 nights, with ice chest and hurricane lamps.
Monday, May 31, 2010
Sunday, May 30, 2010
Isaiah and I went to Belize City to do some shopping for the house. I got the furniture from the Mennonites, it was loaded up on a truck and taken to the Port, then shipped via a barge on a pile of sand. Once they got to Caye Caulker, a smaller boat took them over to the house. Also got the kitchen sink, bathroom fixtures etc.
Saturday, May 15, 2010
Saturday, May 8, 2010
inside so far and the outdoor shower.
Studded room is the bathroom and the kitchen area is to the left. window next to shower is the kitchen window...
Wednesday, May 5, 2010
Monday, April 26, 2010
Friday, April 23, 2010
Thursday, April 15, 2010
Subscribe to:
Posts (Atom)